Skip to content
Free Excel Tutorials
  • Home
  • Excel For Beginners
  • Excel Intermediate
  • Advanced Excel For Experts

Data Analysis

  • Data Series in Excel
  • How To Create Frequency Distribution in Excel
  • Excel Bar Chart
  • How to Create Gantt Chart in Excel
  • How to count table columns in Excel

References

  • How to get last column number in range in Excel
  • LOOKUP function: Description, Usage, Syntax, Examples and Explanation
  • How to use Excel MATCH Function
  • Excel Advanced Lookup using Index and Match Functions
  • How to get relative row numbers in a range in Excel

Data Validations

  • Excel Data validation date in specific year
  • Excel Data validation whole percentage only
  • How To Create Drop-down List in Excel
  • Excel Data validation with conditional list
  • Excel Data validation specific characters only

How to create Gauge Chart in Excel

by

This chapter illustrates how create a Gauge Chart.

A gauge chart (or speedometer chart) combines a Doughnut chart and a Pie chart in a single chart.

This is what the spreadsheet looks like.

 To create a gauge chart, execute the following steps.

1. Select the range H2:I6.

Note: the Donut series has 4 data points and the Pie series has 3 data points.

2. On the Insert tab, in the Charts group, click the Combo symbol.

3. Click Create Custom Combo Chart.

The Insert Chart dialog box appears.

4. For the Donut series, choose Doughnut (fourth option under Pie) as the chart type.

5. For the Pie series, choose Pie as the chart type.

6. Plot the Pie series on the secondary axis.

7. Click OK.

8. Remove the chart title and the legend.

9. Select the chart. On the Format tab, in the Current Selection group, select the Pie series.

10. On the Format tab, in the Current Selection group, click Format Selection and change the angle of the first slice to 270 degrees.

11. Use the ← and → keys to select a single data point. On the Format tab, in the Shape Styles group, change the Shape Fill of each point. Point 1 = No Fill, point 2 = black and point 3 = No Fill.

Result:

Explanation: the Pie chart is nothing more than a transparent slice of 75 points, a black slice of 1 point (the needle) and a transparent slice of 124 points.

12. Repeat steps 9 to 11 for the Donut series. Point 1 = red, point 2 = yellow, point 3 = green and point 4 = No Fill.

Result:

13. Select the chart. On the Format tab, in the Current Selection group, select the Chart Area. In the Shape Styles group, change the Shape Fill to No fill and the Shape Outline to No Outline.

14. Use the Spin Button to change the value in cell I3 from 75 to 76. The Pie chart changes to a transparent slice of 76 points, a black slice of 1 point (the needle), and a transparent slice of 200 – 1 – 76 = 123 points. The formula in cell I5 ensures that the 3 slices sum up to 200 points.

Post navigation

Previous Post:

VLOOKUP without #N/A error in Excel

Next Post:

Manipulating text strings using Left, Mid, Right, Len, Substitute in Excel

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Learn Basic Excel

Ribbon
Workbook
Worksheets
Format Cells
Find & Select
Sort & Filter
Templates
Print
Share
Protect
Keyboard Shortcuts

Categories

  • Charts
  • Data Analysis
  • Data Validation
  • Excel Functions
    • Cube Functions
    • Database Functions
    • Date and Time Functions
    • Engineering Functions
    • Financial Functions
    • Information Functions
    • Logical Functions
    • Lookup and Reference Functions
    • Math and Trig Functions
    • Statistical Functions
    • Text Functions
    • Web Functions
  • Excel VBA
  • Excel Video Tutorials
  • Formatting
  • Grouping
  • Others

Logical Functions

  • IF, AND, OR and NOT Functions Examples in Excel
  • How to use Excel TRUE Function
  • Excel If, Nested If, And/Or Criteria Examples
  • IFNA function: Description, Usage, Syntax, Examples and Explanation
  • OR function Examples in Excel

Date Time

  • Calculate series of dates by workdays in Excel
  • Get work hours between dates and times in Excel
  • Get fiscal year from date in Excel
  • How to calculate next day of week in Excel
  • How to calculate most recent day of week in Excel

Grouping

  • Group arbitrary text values in Excel
  • Map text to numbers in Excel
  • If cell contains one of many things in Excel
  • Group numbers at uneven intervals in Excel
  • How to randomly assign data to groups in Excel

General

  • Count cells that do not contain errors in Excel
  • Print Excel Sheet In Landscape Or Portrait
  • Excel Default Templates
  • How to add sequential row numbers to a set of data in Excel
  • Basic numeric sort formula in Excel
© 2026 xlsoffice . All Right Reserved. | Teal Smiles | Abbreviations And Their Meaning