Skip to content
Free Excel Tutorials
  • Home
  • Excel For Beginners
  • Excel Intermediate
  • Advanced Excel For Experts

Data Analysis

  • How To Load Analysis ToolPak in Excel
  • Create Scatter Chart in Excel
  • How To Insert and Customize Sparklines in Excel
  • How to Create Thermometer Chart in Excel
  • Example of COUNTIFS with variable table column in Excel

References

  • How to get last row in mixed data with blanks in Excel
  • Find Closest Match in Excel Using INDEX, MATCH, ABS and MIN functions
  • Extract all partial matches in Excel
  • How to get address of first cell in range in Excel
  • MATCH function: Description, Usage, Syntax, Examples and Explanation

Data Validations

  • Excel Data validation allow uppercase only
  • Excel Data validation no punctuation
  • Prevent invalid data entering in specific cells
  • Excel Data validation only dates between
  • Excel Data validation must not contain

How to Create Gantt Chart in Excel

by

Illustrate Project Schedule in Gantt Chart

Excel does not offer Gantt as chart type, but it’s easy to create a Gantt chart by customizing the stacked bar chart type.

Below you can find our Gantt chart data.

To create a Gantt chart, execute the following steps.

1. Select the range A3:C11.

2. On the Insert tab, in the Charts group, click the Column symbol.

3. Click Stacked Bar.

Result:

4. Enter a title by clicking on Chart Title. For example, Build a House.

5. Click the legend at the bottom and press Delete.

6. The tasks (Foundation, Walls, etc.) are in reverse order. Right click the tasks on the chart, click Format Axis and check ‘Categories in reverse order’.

Result:

7. Right click the blue bars, click Format Data Series, Fill & Line icon, Fill, No fill.

8. Dates and times are stored as numbers in Excel and count the number of days since January 0, 1900. 1-jun-2017 (start) is the same as 42887. 15-jul-2017 (end) is the same as 42931. Right click the dates on the chart, click Format Axis and fix the minimum bound to 42887, maximum bound to 42931 and Major unit to 7.

Result. A Gantt chart in Excel.

Note that the plumbing and electrical work can be executed simultaneously.

Post navigation

Previous Post:

COSH function: Description, Usage, Syntax, Examples and Explanation

Next Post:

Excel Data validation require unique number

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Learn Basic Excel

Ribbon
Workbook
Worksheets
Format Cells
Find & Select
Sort & Filter
Templates
Print
Share
Protect
Keyboard Shortcuts

Categories

  • Charts
  • Data Analysis
  • Data Validation
  • Excel Functions
    • Cube Functions
    • Database Functions
    • Date and Time Functions
    • Engineering Functions
    • Financial Functions
    • Information Functions
    • Logical Functions
    • Lookup and Reference Functions
    • Math and Trig Functions
    • Statistical Functions
    • Text Functions
    • Web Functions
  • Excel VBA
  • Excel Video Tutorials
  • Formatting
  • Grouping
  • Others

Logical Functions

  • How to use Excel FALSE Function
  • Extract multiple matches into separate rows in Excel
  • FALSE function: Description, Usage, Syntax, Examples and Explanation
  • Complete List of Excel Logical Functions, References and Examples
  • Invoice status with nested if in Excel

Date Time

  • Get age from birthday in Excel
  • Series of dates by day
  • How to calculate project start date based on end date in Excel
  • How to calculate Quarter of Date in Excel
  • Add days exclude certain days of week in Excel

Grouping

  • If cell contains one of many things in Excel
  • Map inputs to arbitrary values in Excel
  • How to randomly assign data to groups in Excel
  • Group times into unequal buckets in Excel
  • Group times into 3 hour buckets in Excel

General

  • How to get original number from percent change in Excel
  • How to calculate percent sold in Excel
  • Excel Default Templates
  • Count cells that do not contain many strings in Excel
  • How to calculate project complete percentage in Excel
© 2026 xlsoffice . All Right Reserved. | Teal Smiles | Abbreviations And Their Meaning