Skip to content
Free Excel Tutorials
  • Home
  • Excel For Beginners
  • Excel Intermediate
  • Advanced Excel For Experts

Data Analysis

  • Use Data Form to input, edit and delete records in Excel
  • How to create Checklist in Excel
  • Conditional Formatting Color Scales Examples in Excel
  • Reverse List in Excel
  • How to Create Gantt Chart in Excel

References

  • Left Lookup in Excel
  • Last row number in range
  • How to calculate two-way lookup VLOOKUP in Excel Table
  • How to get last column number in range in Excel
  • How to reference named range different sheet in Excel

Data Validations

  • Excel Data validation don’t exceed total
  • Excel Data validation number multiple 100
  • Excel Data validation only dates between
  • Excel Data validation unique values only
  • Excel Data validation exists in list

Get project end date in Excel

by

To calculate a project end date based on a start date and duration, you can use the WORKDAY function.

Formula

=WORKDAY(start,days,holidays)

Explanation

In the example shown, the formula in E5 is:

=WORKDAY(C5,D5,holidays)

where “holidays” is the named range G5:G9.

How this formula works

This formula uses the WORKDAY function to calculate an end date. WORKDAY can calculate dates in the future or past, and automatically excludes weekends and holidays (if provided).

In the example shown, we have the project start date in column C, and days in column D. Days represents the duration of he project in work days. In column E, the WORKDAY function is used to calculate an end date. Holidays are provided as the named range “holidays”, G5:G9.

With these inputs, WORKDAY add days to the start date, taking into account weekends and holidays, and returns January 7, 2019 as the calculated end date. Holidays are optional. If holidays are not provided, the same formula returns a end date of January 2.

Note the WORKDAY function does not count the start date as a work day.

Different workdays

The WORKDAY function has a hardcoded notion of weekends, always treating Saturday and Sunday as non-working days. If your schedule has different requirements, you can substitute the WORKDAY.INTL function for WORKDAY. For example, if workdays are Monday through Saturday, you can specify this by providing 11 as the third argument in WORKDAY.INTL like this:

=WORKDAY.INTL(C5,D5,11,holidays)

Post navigation

Previous Post:

DECIMAL function: Description, Usage, Syntax, Examples and Explanation

Next Post:

AVERAGE function: Description, Usage, Syntax, Examples and Explanation

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Learn Basic Excel

Ribbon
Workbook
Worksheets
Format Cells
Find & Select
Sort & Filter
Templates
Print
Share
Protect
Keyboard Shortcuts

Categories

  • Charts
  • Data Analysis
  • Data Validation
  • Excel Functions
    • Cube Functions
    • Database Functions
    • Date and Time Functions
    • Engineering Functions
    • Financial Functions
    • Information Functions
    • Logical Functions
    • Lookup and Reference Functions
    • Math and Trig Functions
    • Statistical Functions
    • Text Functions
    • Web Functions
  • Excel VBA
  • Excel Video Tutorials
  • Formatting
  • Grouping
  • Others

Logical Functions

  • Nested IF function example in Excel
  • How to use Excel FALSE Function
  • How to use Excel NOT Function
  • OR function: Description, Usage, Syntax, Examples and Explanation
  • SWITCH function example in Excel

Date Time

  • How to calculate most recent day of week in Excel
  • Pad week numbers with zeros in Excel
  • How to calculate working days left in month in Excel
  • Get work hours between dates in Excel
  • Find Last Day of the Month in Excel

Grouping

  • Group arbitrary text values in Excel
  • Group times into unequal buckets in Excel
  • How to randomly assign people to groups in Excel
  • Map inputs to arbitrary values in Excel
  • Running count group by n size in Excel

General

  • How to calculate percentage discount in Excel
  • How to calculate project complete percentage in Excel
  • Automatically fill series of cells in Excel using AutoFill
  • With vs Without Array Formula in Excel
  • Excel Operators
© 2025 xlsoffice . All Right Reserved. | Teal Smiles | Abbreviations And Their Meaning