Skip to content
Free Excel Tutorials
  • Home
  • Excel For Beginners
  • Excel Intermediate
  • Advanced Excel For Experts

Data Analysis

  • Error Bars in Excel
  • How to combine 2 or more chart types in a single chart in Excel
  • Remove Duplicates Example in Excel
  • How to Sort by Color in Excel
  • Everything about Charts in Excel

References

  • To count total rows in a range in Excel
  • INDEX function: Description, Usage, Syntax, Examples and Explanation
  • Convert text string to valid reference in Excel using Indirect function
  • Left Lookup in Excel
  • Two-column Lookup in Excel

Data Validations

  • Excel Data validation don’t exceed total
  • Excel Data validation no punctuation
  • Excel Data validation with conditional list
  • Excel Data validation only dates between
  • Excel Data validation must begin with

Get project end date in Excel

by

To calculate a project end date based on a start date and duration, you can use the WORKDAY function.

Formula

=WORKDAY(start,days,holidays)

Explanation

In the example shown, the formula in E5 is:

=WORKDAY(C5,D5,holidays)

where “holidays” is the named range G5:G9.

How this formula works

This formula uses the WORKDAY function to calculate an end date. WORKDAY can calculate dates in the future or past, and automatically excludes weekends and holidays (if provided).

In the example shown, we have the project start date in column C, and days in column D. Days represents the duration of he project in work days. In column E, the WORKDAY function is used to calculate an end date. Holidays are provided as the named range “holidays”, G5:G9.

With these inputs, WORKDAY add days to the start date, taking into account weekends and holidays, and returns January 7, 2019 as the calculated end date. Holidays are optional. If holidays are not provided, the same formula returns a end date of January 2.

Note the WORKDAY function does not count the start date as a work day.

Different workdays

The WORKDAY function has a hardcoded notion of weekends, always treating Saturday and Sunday as non-working days. If your schedule has different requirements, you can substitute the WORKDAY.INTL function for WORKDAY. For example, if workdays are Monday through Saturday, you can specify this by providing 11 as the third argument in WORKDAY.INTL like this:

=WORKDAY.INTL(C5,D5,11,holidays)

Post navigation

Previous Post:

DECIMAL function: Description, Usage, Syntax, Examples and Explanation

Next Post:

AVERAGE function: Description, Usage, Syntax, Examples and Explanation

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Learn Basic Excel

Ribbon
Workbook
Worksheets
Format Cells
Find & Select
Sort & Filter
Templates
Print
Share
Protect
Keyboard Shortcuts

Categories

  • Charts
  • Data Analysis
  • Data Validation
  • Excel Functions
    • Cube Functions
    • Database Functions
    • Date and Time Functions
    • Engineering Functions
    • Financial Functions
    • Information Functions
    • Logical Functions
    • Lookup and Reference Functions
    • Math and Trig Functions
    • Statistical Functions
    • Text Functions
    • Web Functions
  • Excel VBA
  • Excel Video Tutorials
  • Formatting
  • Grouping
  • Others

Logical Functions

  • IFERROR function: Description, Usage, Syntax, Examples and Explanation
  • Excel If, Nested If, And/Or Criteria Examples
  • Invoice status with nested if in Excel
  • Not Equal To ‘<>‘ operator in Excel
  • How to use Excel TRUE Function

Date Time

  • Add decimal minutes to time in Excel
  • How to calculate most recent day of week in Excel
  • How to get same date next year or previous year in Excel
  • Pad week numbers with zeros in Excel
  • Count dates in current month in Excel

Grouping

  • Group times into 3 hour buckets in Excel
  • Map text to numbers in Excel
  • Group numbers with VLOOKUP in Excel
  • Calculate conditional mode with criteria in Excel
  • Group numbers at uneven intervals in Excel

General

  • How to get Excel workbook path only
  • How to generate random date between two dates in Excel
  • Flash Fill in Excel
  • How to set or clear a print area in Excel Worksheet
  • Index and match on multiple columns in Excel
© 2025 xlsoffice . All Right Reserved. | Teal Smiles | Abbreviations And Their Meaning